Project 1: Foundation Engineering

remove the wall and floor tiles 2915.00

remove the original doors and windows and sets 275.00

excavate the toilet of the old house 500.00

remove other 500.00

self leveling 924.00

remove the composite floor 288.00

remove the old furniture 500.00

hang the fiber mesh on the wall 1120.00

remove the water and electricity 500.00

light brick wall (120 mm double-sided plastering) 483.00

masonry wall opening 236.80

wall peeling (gypsum ash) 716.00

wall blank base treatment 358.00

item 2: Waterway and circuit engineering

strong and weak current construction (lump sum price) 5520.00

waterway construction (lump sum price) 1550.00

strong Installation of weak current box 100.00

change down pipe 370.00

change down pipe 189.00

balcony water outlet 300.00

Project III: guest restaurant and aisle

latex paint base treatment (putty) 2024.00

latex paint z736.00

gypsum board plane ceiling 200.00

stone height line modeling 600.00

stone high line 480.00

Project IV: master bedroom

emulsion paint base treatment (putty) 913.00

latex paint 498.00

stone high wire 192.00

Project V: secondary bedroom

latex paint base treatment (putty) 880.00

latex paint 480.00

stone high wire 184.00

Project VI: Kitchen

General specification of wall tiles (300 × 450 < size ≤ 300 × 600) 1300.00

common specification of floor tiles (size 300 × 300) 299.00

kitchen waterproof treatment 270.00

kitchen and sanitary package pipes 156.00

pavement of doorway stone 45.00

kitchen backfilling and surface leveling 322.00

tiling external corner contact angle 150.00

item 7: bathroom

tiling general specification (300 × 450 < size ≤ 300 × 600) 1137.50

common specification of floor tiles (size 300 × 300) 227.50

toilet backfilling and surface leveling 245.00

toilet waterproof treatment 630.00

kitchen and sanitary package pipes 156.00

pavement of door stone 30.00

toilet sewer protection works 200.00

tiling external corner corner 150.00

item 8: balcony

latex paint base treatment (putty) 352.00

latex paint 192.00

general specification of floor tiles (200 × 200 < size ≤ 800 × 800) 325.00

common specification of wall tiles (300 × 450 < size ≤ 300 × 600) 195.00

balcony railing base tiling 136.50

balcony waterproof treatment 315.00

balcony guarantee 178.75

little great wall or anticorrosive wood ceiling 1000.00

Item 9: miscellaneous

materials upstairs 1500.00

material transportation 600.00

indoor garbage removal 800.00

lamp installation 200.00

sanitary ware installation 150.00

hardware installation 100.00

finished product protection 300.00

the above is Xiaobian for you A quotation of 69 square meters of half package decoration, if you happen to be distressed about decoration, you can come to the platform for consultation on all kinds of decoration problems. At the same time, the Wuhan home decoration network decoration bidding platform can select 3 to 4 suitable decoration companies to measure rooms for free and formulate decoration plans. You can compare them, and some decoration money reduction is waiting for you. See the activity page for details http://whjzw.net/zb/。